Sampling, monitoring, and environmental answers.

Canadian Shield supports field investigations, sampling programs, groundwater review, and environmental monitoring across Northern Ontario.

What a sampling and monitoring program involves.

Sampling is only the visible part of the work. The parts that make results defensible - planning, documentation, and laboratory coordination - usually decide whether the data holds up later.

A program starts with a sampling and analysis plan: where and when samples are collected, what containers and preservation each analysis requires, which quality control samples accompany the batch, and how results will be reported and compared against the criteria that apply. In the field, samples are labelled, preserved, and tracked on chain of custody documentation so the laboratory can accept and report them, and so anyone reviewing the data later can see exactly who handled each sample and when.

Media covered across Ontario sites includes drinking water - raw, treated, and distribution points - wastewater effluent, groundwater, surface water, sediment, soil, and landfill leachate. Each has its own handling requirements, and each answers a different question. Drinking water sampling shows whether a system is performing for the people drinking from it. Groundwater sampling shows what is moving beneath a site. Effluent sampling shows what a treatment system is actually discharging. Programs are usually designed around the question being asked rather than around a standard list of analytes.

Related reading covers treated, distribution, and raw water sampling and soil sampling and stratification services. Programs are described in more detail on the drinking water systems and wastewater management pages.

Monitoring wells and groundwater work.

Groundwater answers usually start with a well drilled to the right depth in the right place, sampled on a schedule that shows change over time.

Monitoring wells in Ontario are constructed under the Ontario Water Resources Act and the Wells Regulation, and must be drilled by a licensed well contractor - drilling falls under the Class 1 category, while monitoring, sampling, and testing equipment falls under Class 5. For environmental site assessment work, the regulation's requirements for test holes apply to monitoring wells, which affects construction standards, casing, and documentation.

Sampling those wells adds its own requirements. Purging - clearing standing water from the well before sample collection - has to be documented, with the date, start and stop times, volume purged, the rationale for the approach, and the measures used to prevent cross-contamination between wells. Those records matter when sampling supports a Record of Site Condition, and they matter just as much when results are being compared across quarters and years. Landfill monitoring programs typically run groundwater wells on quarterly or annual schedules alongside surface water, sediment, and leachate sampling, with results compared against trigger levels and reported to the ministry. That program design is shown in the municipal landfill and leachate project.

Well installation itself is coordinated through construction services, and related reading covers monitoring well installation and sampling in Ontario and monitoring well installation as a guide to groundwater management.

Frequently asked questions.

What is a chain of custody form?

A chain of custody form is the record documenting every person who handled a sample from collection through laboratory analysis. It records who collected each sample, when, how it was preserved, and every transfer of custody in between. Laboratories require it to accept and report results, and reviewers rely on it to confirm the samples analysed are the samples collected.

What is a sampling and analysis plan?

A sampling and analysis plan sets out where, when, and how samples are collected, the containers and preservation required for each analysis, the quality control samples that accompany each batch, and how results will be reported and compared against applicable criteria. Having the plan settled before fieldwork begins is what makes the resulting data usable for regulatory and decision-making purposes.

Do monitoring wells need to be installed by a licensed contractor?

Yes. Wells in Ontario - including monitoring wells - fall under the Ontario Water Resources Act and the Wells Regulation, and must be installed by a licensed well contractor. Drilling is covered by the Class 1 category, and monitoring, sampling, and testing equipment by Class 5. For environmental site assessment work, the regulation's requirements for test holes apply to monitoring wells.

What does groundwater sampling involve?

Purging, sample collection, preservation, chain of custody documentation, laboratory analysis, and reporting. Where the sampling supports a Record of Site Condition under Ontario Regulation 153/04, purging records must document the date, start and stop times, volume purged, the rationale for the approach taken, and the cross-contamination mitigation measures used.

How often should monitoring wells be sampled?

It depends on what the monitoring is for. Landfill and compliance programs commonly run quarterly or annual schedules, while investigation-driven sampling may be more frequent for a defined period. The schedule should be set around what change the program needs to detect, and reviewed once enough data exists to show a trend.

Have a remote, regulated, or difficult water/wastewater project?

Tell Canadian Shield what you are planning, where the site is, and what problem needs to be solved. The team can help identify the right next step.