Environmental engineering and permitting support for regulated sites.

Canadian Shield helps project owners understand site constraints, document practical system options, and move through water and wastewater planning with clearer next steps. Our decision guide has approval routes explained for mobile and site-specific projects.

Certified Hazardous Materials Team

  • Environmental contamination assessment and reporting
  • Hazardous waste site management and manifesting
  • TDG-qualified personnel for dangerous goods handling

Remote Location Capabilities

  • Experience serving remote and First Nations communities across Canada
  • Modular, containerized treatment systems for off-grid sites
  • Long-term maintenance and operator training programs

Where permitting usually applies.

Most water and wastewater projects in Ontario touch at least one approval process. Knowing which one applies early usually saves more time than it costs.

Three approval routes cover most situations. An Environmental Compliance Approval under the Ontario Water Resources Act applies to sewage works above the capacity threshold, works serving multiple properties, and works that discharge outside the property they serve. The Environmental Activity and Sector Registry covers lower-risk activities that meet standard requirements, including storm water management works and sewage works used solely to dewater a construction site. And Ontario Building Code permits, issued by local building departments, cover most onsite sewage systems and building-related work.

Water taking sits on its own track. Taking more than 50,000 litres per day generally requires a Permit to Take Water under the Ontario Water Resources Act, which affects dewatering operations, community supplies, and a range of construction and industrial activities. Discharge conditions matter too: water leaving a site has to meet the standards that apply to it, which is why dewatering and discharge planning are usually reviewed together rather than separately. For dewatering-specific questions, see the dewatering, assessments, and mitigation article.

Site assessments and the Record of Site Condition.

When a property is being sold, redeveloped, or changed in use, the site assessment work determines what is known about the ground and what has to happen next.

A Phase I environmental site assessment is a records-review-and-interview exercise. It identifies contamination potential without disturbing the site, and it is usually the first document a lender, purchaser, or regulator asks for. Where the Phase I work identifies potential contamination - or where the property's history triggers it - a Phase II assessment follows. Phase II work involves soil sampling, with groundwater or sediment sampling where site conditions call for it, and the results determine whether further work is required.

Where a Record of Site Condition is needed, it is filed in Ontario's Environmental Site Registry. The work is carried out and signed by a Qualified Person - typically a professional engineer or professional geoscientist, or another person with the prescribed qualifications under Ontario Regulation 153/04. Assessment timing matters in practice: properties being sold or redeveloped often need the assessment completed before closing, and properties going vacant may also trigger requirements. Related reading covers environmental site assessments, environmental impact assessments, and site remediation strategies.

Hazardous materials work runs alongside site assessment. Building and demolition projects in Ontario often involve regulated materials that must be identified, managed, and disposed of through licensed channels under Ontario Regulation 347, with manifesting and transport handled by qualified personnel. The hazardous materials management article covers the general scope, and construction services covers hauling and disposal work, including the demolition site clean-up project. Compliance and inspection work for regulated equipment is covered in the TSSA compliance report article.

What Canadian Shield brings to permitting work.

Permitting support is most useful when it is connected to the site work, not handled as paperwork after the fact.

The team combines assessment, documentation, and field capacity: environmental site assessments carried out by in-house qualified persons, hydrogeological review, sampling and monitoring programs, and construction support for the work that follows approval. That connection matters because the documents a regulator receives describe physical work that has to be built and operated as described. Municipal and landfill-scale monitoring experience is described in the municipal landfill and leachate project, and wastewater approval questions are covered on the wastewater management page.

Frequently asked questions.

What is the difference between an Environmental Compliance Approval and an EASR registration?

An Environmental Compliance Approval is an individual ministry approval for activities that carry environmental controls. The Environmental Activity and Sector Registry is a self-registration route for lower-risk activities that follow standard requirements. For wastewater work in Ontario, registered activities include storm water management works and sewage works used solely to dewater a construction site; higher-risk works still require an Environmental Compliance Approval.

When is a Phase II environmental site assessment required?

Phase II work - which involves soil sampling, plus groundwater or sediment sampling where site conditions call for it - is generally required for properties that were or are an industrial use, subject to narrow exemptions, and whenever earlier assessment work identifies potential contamination. A Qualified Person determines the site-specific scope, and the results support a Record of Site Condition where one is required.

Who is a Qualified Person?

In Ontario's environmental site assessment process, a Qualified Person is the regulated professional responsible for planning and signing the assessment work and any resulting Record of Site Condition. That is typically a professional engineer or professional geoscientist, or another person holding the qualifications prescribed under Ontario Regulation 153/04.

Do I need a Permit to Take Water for dewatering?

Under the Ontario Water Resources Act, taking more than 50,000 litres per day generally requires a Permit to Take Water, and many construction dewatering operations fall above that threshold. The discharge conditions for the water leaving the site are reviewed alongside the permit question, because both depend on the same site conditions.

How long does an approval take?

There is no fixed timeline. The duration depends on the completeness of the application, the ministry's review cycle, and whether the site conditions raise questions that need more information. The practical lever available to project owners is preparation: complete documentation describing a site that has been properly characterized usually produces fewer rounds of revision.

Have a remote, regulated, or difficult water/wastewater project?

Tell Canadian Shield what you are planning, where the site is, and what problem needs to be solved. The team can help identify the right next step.