Soil   Hydrogeological   Nutrient Management   Property Development   Training
Welcome to CSCA Gallery: Ecoflo

Return to the Ecoflo site or jump to the main gallery:

Ecoflo

Main Gallery

 

ECOFLO IMAGE GALLERY

Click on any picture to see it enlarged

 

Transportation of 2 Ecoflos by land

Barge used to transport Ecoflo over water

Installation of a double system on an island

Installation before final backfill

Lift station

Septic tank above ground.

Installation from septic tank to lift station then to double Ecoflo

Plumbimg of double Ecoflo with pressurized flow divider

Scarification before sand layer

Installation of Ecoflo with cement tank

Sand for mantle

Placement of center devider for Ecoflo

Center devider for Ecoflos

Backfilling of Ecoflos

Plastic tank instalation on an island

Retainning wall built for final landscape

 

Finished single installation

Transportation of 16 Systems

Installation of 16 Systems

Finished single installation

Divider being placed on 12 inches of septic stone

Geotextile being place around ecoflo

Double Installation

Sand placed ready for stone layer

 

Transportation of sand by barge

 

Backfill of ecoflo

 

Preperation for construction of retainning wall

Placing ecoflo center divider

 

2 septic tanks in line

 

2 septic tanks in line

 

 
 
     
   
   
   
   

 


   
 ©Canadian Shield Consultants Inc. 2005 Last modified: 05/14/2005 12:09:12